N�mes Gold Finish Dual Handle Lavatory Sink Faucet

N�mes Gold Finish Dual Handle Lavatory Sink Faucet
 
Alternative Views:


MSR Price: $896.00


Product Code: WBS897POK
Request Commercial Quote

Description Technical Specs Extended Information
 

N�mes Gold Finish Dual Handle Lavatory Sink Faucet

Nimes is a modern dual handle bathroom sink faucet. The bright gold finish will either make it stand out as a centerpiece of your bathroom, or help it blend in if you choose the same finish for other fixtures as well. It comes with a built-in hot and cold water mixer, deck mount, one hole required for installation. Only the best quality materials have been used � the body is made of solid brass and the valve core material is ceramic, for a long lasting life time. It comes complete with accessories and installation instructions.

N�mes Gold Finish Dual Handle Lavatory Sink Faucet Specifications

  • Type : Bathroom Sink Faucet
  • Faucet Mount : Single Hole
  • Spool Type : Ceramic Plate Spool
  • Valve Core Material : Ceramic
  • Style : Classic
  • Hot & Cold Water : Yes
  • Number of Handles : Dual Handles
  • Installation Type : Deck Mount
  • Surface Treatment : Gold
  • Style : Dual Holder Single Hole
  • Body Material : Solid Brass
BathSelect� Manufacturer Warranty Information