Rimini Chrome Single Handle Deck Mount Bathroom Sink Faucet

Rimini Single Handle Deck Mount Bathroom Sink Faucet
 
Alternative Views:


MSR Price: $276.00


Product Code: WBS854GHT
Request Commercial Quote

Description Technical Specs Extended Information
 

Rimini Single Handle Deck Mount Bathroom Sink Faucet

Rimini might seem like a regular bathroom faucet, but the stylish handle design makes it stand out and catches the eye. It is a bright chrome finish faucet that will perfect fit in any modern bathroom. It is deck mount, single hole, with one handle and built-in hot&cold water mixer. Only the best materials have been used � valve core in ceramic material, for a long lasting life time. It comes complete with accessories and installation instructions.

Rimini Single Handle Deck Mount Bathroom Sink Faucet Specifications

  • Type : Bathroom Sink Faucets
  • Faucet Mount : Single Hole
  • Type : Ceramic Plate Spool
  • Valve Core Material : Ceramic
  • Style : Contemporary
  • Hot & Cold Water : Yes
  • Number of Handle : Single Handle
  • Installation Type : Deck Mount
  • Surface Treatment : Chrome
  • Style : Single Holder Single Hole
  • Hot & Cold Water : Yes
  • Weight : 5.51 Pounds
Rimini Single Handle Deck Mount Bathroom Sink Faucet

BathSelect� Manufacturer Warranty Information BathSelect Product Warranty
Installation Instructions for Rimini Single Handle Deck Mount Bathroom Sink Faucet