Soria Deck-Mount Bathroom Sink Faucet
The dark
oil rubbed bronze finis makes our Soria sink faucet look amazing, even in the most sophisticated modern bathroom designs. It is a tall faucet which perfect fits with stylish bowl sinks. It is very easy to install, deck mount, a single hole required for installation. It comes with one handle for the easy control of hot and cold water mixing. Only the best materials have been used: the body, spout and handle are made of solid brass and the valve cartridge is ceramic, for long lasting life time. It comes complete with accessories and installation instructions.
Soria Deck-Mount Bathroom Sink Faucet Specifications
- Type : Bathroom Sink Faucet
- Item Weight : 4.7 Pounds
- Product Dimensions : 17.7 x 9.4 x 2.6 inches
- Feature : Centerset
- Style : Contemporary
- Finish : Oil Rubbed Bronze
- Number of Handle : Single Handle
- Faucet center : Single Hole
- Valve Type : Ceramic Valve
- Faucet Body Material : Brass
- Faucet Spout Material : Brass
- Faucet Handle Material : Brass
- Style : Contemporary
|
BathSelect� Manufacturer Warranty Information
Installation Instructions for Mount Bathroom Sink Faucet