Comb Hand Shower ABS Plating High-End Oxygenics Revit Families Ultra-thin High Pressure Water-Saving Hospitality Industry Architecture Design Shower Head

Comb Hand Shower ABS Plating High-End Oxygenics Ultra-thin High Pressure Water-Saving Shower Head
 
Alternative Views:


MSR Price: $140.15


Product Code: WBS10405
Request Commercial Quote

Description Technical Specs Extended Information
 

Comb Hand Shower ABS Plating High-End Oxygenics Revit Families Ultra-thin High Pressure Water-Saving Shower Head

Burnt out on your current shower routine? Built around a powerful Oxygenic engine, this shower head is designed to deliver high-efficiency performance through 2 unique function that let you switch from shower head to hair comb. The shower head transforms your shower to give you a mini vacation from the stresses of everyday life. This water saving shower head acts as a powerful massage-like pulsating sensation that will invigorate you and instantly refresh your mood sprays and hit you at supersonic speed to relieve tired, achy muscles so you can start your day refreshed. It's turbo pressure boost nozzle technology maximizes your water pressure output performance and steady water flow to provide you a comfortable shower and prevent clogging. It converts weak water pressure into a powerful spray, regardless of existing water pressure. The result will be a quality shower experience every time.

Comb Hand Shower ABS Plating High-End Oxygenics Revit Families Ultra-thin High Pressure Water-Saving Shower Head Features:

  • Brand Name: BathSelect
  • Model Number: BS10405
  • Installation Method: Wall Mounted
  • Shower Head Feature: Water Saving Shower Head
  • Function: Rainfall
  • Body Material: ABS Plastic
  • Type: : Fixed Support Type
  • Control Type: Single Holder
  • Thread Size: Standard G1/2